|
|
Research
Research Interests
- Air Pollution Modeling
- Incineration
Research Projects
- 90-94 Hazardous vapor incineration GCHSRC $264,000 co-PI.
- 90-91 Enhanced CO Screen Test Fla DOT $ 11,000 PI.
- 91-93 Poll. releases from surface finishing US EPA $197,000 co-PI.
- 91-94 Ozone Evaluation of Central Fla Fla DEP $192,000 co-PI.
- 92-93 Update of FDOT CO Screen Test Fla DOT $ 15,000 PI.
- 92-94 Landfill Gas Emissions Orange Cnty $111,000 co-PI.
- 93-94 Determining Correct RVP values Fla DOT $ 17,000 PI.
- 93-96 Removal of NOx from HWIs GCHSRC $162,000 co-PI.
- 93-97 FLINT - Fla Intersection Model Fla DOT $300,000 co-PI.
- 93-95 Hot-Cold Start Proportions Fla DOT $200,000 co-PI.
- 94-95 Tech Supt-Health/Env Impacts FCSHWM $ 15,000 PI.
- 96-97 COSCREEN update to Windows Fla DOT $ 56,000 PI.
- 96-98 NOx Control at KSC Boilers-I NASA $298,000 co-PI.
- 97-99 NASA Particulate Matter Study NASA $173,000 PI.
- 98-99 NOx Control at KSC Boilers-II NASA $140,000 co-PI.
- 99-00 Empirical Ozone Modeling FDEP $ 75,000 PI.
- 00-01 NOx Control at KSC Boilers-III NASA $100,000 co-PI.
- 01-02 GA DOT Air Quality Model Ga DOT $ 33,000 PI.
- 01-02 Tech Transfer - H2O2 to Control NOx GCHSRC $ 33,000 PI.
- 02-04 Ala. Mobile6 and Air Quality Model AL DOT $123,000 PI
- 02-03 Emission Inventory of Central Fla Metroplan $ 20,000 PI
- 04 Update of COSCREEN to Mobile6 FDOT $ 46,000 PI
- 06-07 Air Quality Services to Metroplan Metroplan $ 32,000 PI
- 07 Odor Modeling FCSHWM $ 40,000 PI
- 07-09 APC Engineering Experience for UG Siemens $270,000 PI
*For these co-PI research projects, Dr. Cooper was the main proposal writer and the research project manager
|